I was originally hyped to get it asap. At this point it doesnt seem as big a deal. 30 bucks is 30 bucks, but as someone else pointed out it will be in transit far shorter with ups. So I guess it will be worth it in that respect.
Its 18 bucks less, not 30 and a big headache to us cause this would force us a huge lot of paperwork.
BTW, we should have the new SSD3 board for at the end of this week ... we will do the same as before : solder two units it by hand to validate the pcb and start producing factory units.