bendor
Fio's Quartermaster

- Joined
- Oct 11, 2003
- Posts
- 482
I had a Post in General but it got moved. I think this forum is more appropriate anyway.
Here it is near the beginning after me and a buddy studded it out and insulated it.
And now the drywall and spackle and sub floor are in, along with the electric.
Here it is near the beginning after me and a buddy studded it out and insulated it.
And now the drywall and spackle and sub floor are in, along with the electric.
Last edited:
Very nice work. How much has the project cost you so far?

